Plasser & Theurer stands for global expertise in track construction and maintenance. For decades, we have developed innovative technologies and have successfully applied them on track. To present these technologies to the expert community and introduce them to the market, solid information and client references are essential.
The URM 700-2 universal ballast cleaning machine is our new multitalent for ballast bed cleaning. Unique on the world market, its innovative technology enables us to fill a market niche by offering complete turnout service.
Most contracting companies do not offer special services such as an on-track turnout maintenance system. We have taken complete turnout service to a new level. At Austrian Federal Railways (ÖBB), we have been able to use the technology.
Turnouts place particular demands on maintenance. Due to their key function in the track system, they are considered essential infrastructure components. Turnout installations on modern high-capacity lines consist of concrete sleepers, sensitive drive and control systems, and heavy rail profiles. When maintaining turnouts, these expensive components must be handled with utmost precision.
Cost-efficiency is the goal – not only when maintaining plain line track, but even more so when maintaining turnouts which often affects two tracks at the same time. The duration of track closures is a key factor, particularly for main-line railways.
The URM 700-2 offers decisive advantages when managing tight schedules for turnout maintenance. There is no need to remove and reinstall the turnout. Both ballast cleaning and tamping in turnouts can be completed during one single shift. As soon as the work has been completed, the track section can be reopened for traffic.
For this reason, the Austrian Federal Railways have opted for employing our system on their priority routes. During maintenance with the URM 700-2, the adjacent track remains open for traffic which reduces track possessions to a minimum. This is impossible when employing conventional methods involving excavators and cranes.
Our URM 700-2 ballast cleaning machine is the core technology for turnout maintenance. This machine makes it possible to clean the ballast bed without removing the turnout. Moreover, it allows for continuous working progress. In addition, it cleans the ballast shoulders. The machine is also suited for maintaining large high-speed turnouts with movable-point frog. Another advantage is that sections of track at connecting tracks and between turnouts can be cleaned in one pass.
Thanks to the fast and independent installation and removal of the excavating unit, the URM 700-2 works cost-efficiently on short sections of track.
This is exactly what railway administrations require: fast, safe, and high-quality ballast cleaning in turnouts without long track possessions.
After the URM 700-2 has completed its work, our all-rounder for track maintenance enters the picture to ensure optimal geometrical quality of the turnouts. The Unimat 09-475/4S N-Dynamic turnout and track maintenance machine combines the functions of three machines: 3-rail lifting and 4-rail tamping, profiling, stabilising, and control measuring. A unique feature makes the Unimat 09-475/4S N-Dynamic stand out: it can also ballast the tamping zones. Complete turnout service including the ballasting step can be performed within a single track possession.
Traffic on the adjacent track continues without interruption which minimises operational hindrances.
Our offer expands the range of products and services of infrastructure operators and construction companies. We translate our expertise and our technologies into diverse offers which create the basis for new partnerships. The use of innovative and specialised technologies is an economical alternative to machine purchases.
Calculated risk that speaks for itself:
This offer is made by Franz Plasser Vermietung von Bahnbaumaschinen Gesellschaft m.b.H.
Cost-efficiency: comparing various methods of work
The URM 700-2 makes ballast bed cleaning and ballast exchange in turnouts even more efficient. The machine's main advantage is that it reduces construction time considerably, making it particularly interesting for infrastructure operators. The URM produces consistently high work quality and reduces the costs of turnout maintenance. Shorter construction times increase network availability, which translates into fewer delays. Ultimately, this gives rise to greater acceptance for the railway system.
In a practical experiment, we compared the cost-efficiency of various work processes:
The construction site used in the experiment consisted of four turnouts with concrete sleepers. The radius of the adjacent track was 1,200 m; this included the closure panels and the small areas around connecting track that serve as transitions to plain line tracks.
The results show that the URM 700-2 has unbeatable cost-efficiency